Thornton Park Ltd - Stage 2

Thornton Park Ltd - Stage 2

205 THORNTON ROAD, CAMBRIDGE

Thornton Park is a 17 Lot residential development adjacent to Bunnies childcare centre on Thornton Road and is the last large tract of land to be developed in the Thornton Road residential area following on from Oaklands. The project involved the construction of approximately 230m of new cul-de-sac with provision for future development to the East and development of 17 new residential sections.

Thornton Park Ltd - Stage 2


Thornton Park Ltd, the developers, have had planning consent for some time (prepared and obtained by Cogswell Surveys), along with approved engineering design drawings (prepared by Aireys Consultants).
Our firm has supervised the physical construction of the cul-de-sac and infrastructure works along Thornton Road, which connected to existing sewer and stormwater reticulation.
Construction work was undertaken by Sayer Drainage Ltd under the supervision of Cogswell Surveys Senior Surveyor Geoff Thomas. Project management including environmental, health and safety, and Waipa District Council requirements were overseen by Directors Phil Cogswell and Pete McLachlan.
Along with project management services our survey staff controlled set out of works, surveying and as built information to meet Council specifications.